Projected infrastructure includes basement: an auditorium; parking lot; tank; bombs room; asensor and sshh. first level: exhibition hall; classroom workshop; nursery and ss.hh with dressing rooms. second level cafeteria; classroom workshop; foyer mezazine asensor and ss.hh. third level library; attention area; classroom box gym workshop; asensor and ss.hh with dressing rooms. rooftop two sports slab with stands and elevator. autocad 2020.